Storm Lake Iowa Project Awaysis


(click photos for larger view)



2/20/07
 The high rate sand filters are in place inside the basement levels of the filter building.



2/20/07
Ever wonder how all those mechanical things work? The electrical controls are in the basement of the filter building.



2/20/07
Each one is labeled like the one shown here for the Lazy River Slide A.



2/20/07
Here is where the pipes come into the filter building from the lazy river to the west of this location.



2/20/07
The inside of the filter building is a maze of very large pipes, pumps and large sand filters.


2/20/07
Here crews install a pump for the indoor water park.
 

May Photos

June Photos

July Photos

September Photos

October Photos

November Photos

December Photos

February Photos

 

More Photos:    Waterpark   Indoor Waterpark   Golf Course   Sunrise Pointe   Filter Building   Great Lawn    Aerial   Professional   Webcams