6/02/2006
This picture is a wide shot of the work progressing on the filter building. In the picture you can see the second part of the framing structure going up and additional spots where piping will be coming into or going out to the pool. |

6/09/2006
This picture shows a little closer view of the filter building walls that are being framed up in preparation to being poured. You can also see how the contractor has inserted a pipe to use as a placeholder while they pour the concrete wall to prevent having to drill out the holes after the wall has been formed. |

6/09/2006
This is a real close up shot of the inside of the two framed in walls prior to concrete being poured in. |