9/01/2006
This picture is taken from the third floor of the King’s Pointe Resort of the filter building progress. Crews are framing up with wooden frames the interior and western walls of the filter building. |

9/01/2006
This picture shows the western wall of the filter building and all the piping that is required to move water into and out of the filter building. |

9/01/2006
Crews continue to work on the construction of the walls for the filter building. |

9/15/2006
Work on the waterpark filter buildings continues to move forward including the framing up and pouring of the interior walls. |

9/15/2006
This picture is in the southwest corner of the filter building at the underground level showing all the build in water tanks and areas of the filter building. The large sand filters that will filter the pool water for recirculation will be housed on this level of the building. |

9/15/2006
The pipes coming from the various waterpark pool bodies are built into the wall. Shown here are the pipes on the inside of the filter building coming from the outdoor waterparks, both the main pool body and the lazy river. |

9/26/2006
Crews from McHan Construction work on the finishing touches of a column support inside the filter building. |

9/26/2006
Crews are backfilling the around the south walls of the filter building. With the piping in place from the pools crew are using a rock base to ensure that the pipes are protected.
|
June Photos
July Photos
September Photos
October Photos
November Photos
December Photos
February Photos
May 2007 Photos |
More Photos: Waterpark Indoor Waterpark Golf Course Sunrise Pointe Filter Building Great Lawn Aerial Professional Webcams
|