6/02/2006
Crews have formed up the concrete medians in the south golf course parking lot and placed the side barriers for an upcoming pour of one section of the parking lot. |
6/02/2006
Crews have poured one section in the lower portion of the frame and a second portion along the right side of the frame as the frame up a second median in the parking lot. The medians will be filled with dirt and then have planting put in them. At this time the plants have not been determined. |
6/09/2006
This picture shows the south golf course parking lot from the southwest edge of the golf course club house building. Most of the lot has been poured with about two sections left to pour. |

6/16/2006
Crews are pouring one of the last sections of the south parking lot for the golf course. |

6/16/2006
Crews have made good progress in preparing the new Sunrise Park Road for paving as shown in this picture. |