Storm Lake Iowa Project Awaysis


(click photos for larger view)

5/01/2007
New rip rap along the jetty has been completed.  The project removed old broken concrete and replaced it with new natural field stone.

5/01/2007
Contractors are working on the lake bank rehabilitation portion of the contract.

5/01/2007
The contractor is digging out one of the two large rain gardens that will filter storm water from the two large parking lots to the north of the great lawn, playground, and beach area.

5/01/2007
A worker stands inside the excavated hole of the rain garden to make sure that depth of the area is correct before a variety of different rock and soil types are placed inside to aid in the cleaning process of the storm water.

5/01/2007
A look from atop the indoor slide tower at the construction on the large rain garden areas.

May Photos

June Photos

July Photos

More Photos:    Waterpark   Indoor Waterpark   Golf Course   Sunrise Pointe   Filter Building   Great Lawn    Aerial   Professional   Webcams