10/06/2006
The contractor has begun putting up the first segments of the block foundations on top of the concrete footings for the north and east walls of the indoor waterpark. |

10/06/2006
The northeast corner of the slide tower with the first layers of block foundations on top of the concrete footings and the pillars for the slide tower structure inside. |
10/13/2006
The contractor has begun putting up the steel frame of the indoor waterpark. This particular section is the slide tower area. |

10/13/2006
Crews are digging the south foundations for the indoor aquatics building.
|

10/13/2006
Crews are digging the south foundations for the indoor aquatics building. |

10/20/2006
Crews continue to put up the steel structure from the slide towers to the east on the indoor water park. |

10/20/2006
Crews have formed up the block foundations on top of the concrete footings along the southern portion of the indoor waterpark. The area where the walls go out to the south will be the restroom area which will be shared by the indoor and outdoor water parks. |

10/20/2006
The steel framing work that has been accomplished to date on the indoor waterpark. |

10/27/2006
This is a picture of the steel for the indoor aquatics the higher section of red beams is the slide tower area. Steel is now up surrounding the outside areas of the indoor aquatics building. |

10/27/2006
Crews are lifting the steel components of the roof structure on the indoor waterpark into place. |
|
September Photos
October Photos
November Photos
December Photos
January Photos
February Photos
March Photos
May Photos
June Photos
July Photos
|
More Photos: Waterpark Indoor Waterpark Golf Course Sunrise Pointe Filter Building Great Lawn Aerial Professional Webcams
|