This is the north section of the east side of the lodge first floor where the contractor has poured some of the concrete floors. There is no basement section under this part of the first floor. |

8/04/2006
This picture looks west across the east side of the lodge showing the contractors progress in pouring the floors to the east end basement. The framed up concrete block structure in the middle of the frame is the elevator shaft. |

8/04/2006
Picture shows the west side of the basement for the lodge with the elevator shaft on the right and the south walls on the left. |

8/07/2006
Prefabricated walls from Omaha arrived on site and are ready to be set up and put in place. |

8/07/2006
Crews begin the process of setting up the walls on the basement level east of the lodge. |

8/07/2006
This picture is looking west from above the basement level showing the hallway and rooms as the walls on the basement level east of the lodge go up. |

8/09/2006
In this picture the crews have finished putting up the walls on the east basement level of the lodge and are working on some finishing touches for the walls. |

8/09/2006
As part of the installation of walls process crews were busy putting in the patios for the first level rooms, in this picture a construction worker is standing on one of the decks for the first floor rooms. |

8/09/2006
On the west end of the lodge contractors are beginning the placement of steel. |

8/09/2006
This picture is looking east down the hallway of the basement level walkout rooms of the lodge. The concrete in the front right of the picture is the corner of the elevator shaft. |

8/11/2006
This picture shows the floor decking being put on the top of the basement level lodge walls. |

8/11/2006
Crews have now set several pieces of the red steel framing structure that will support the upper levels of rooms in the lodge. |

8/11/2006
Picture looking east at the west end of the lodge where the final walls are being framed in on the far west while steal races to catch up moving from east to west. |
May Photos
June Photos
July Photos
August Photos
September Photos
October Photos
November Photos
December Photos
January Photos February Photos March Photos May '07 Photos
June '07 Photos
July '07 Photos
August '07 Photos |
|
More Photos: Waterpark Indoor Waterpark Golf Course Sunrise Pointe Filter Building Great Lawn Aerial Professional Webcams
|