Click photos for a larger view
12/05/2006
Crews work on the entrance area to King’s Pointe Resort. |
12/05/2006
A view of the entrance to King’s Pointe from the northern edge of the covered entry. |

12/05/2006
The separate entrance to the conference facilities is getting the glass and window frames installed. |

12/05/2006
A view of the lake from the second floor walkway above the entrance to King’s Pointe Resort. |

12/05/2006
The conduit and fire suppression system piping is being run along the ceiling of the hallways in the lodge. |
12/05/2006
Crews are sheet rocking the walls inside the rooms on third floor of the King’s Pointe facility. |

12/05/2006
After the walls have gotten their sheet rock another member of the crew applies the first layer of tape to the joints. |

12/05/2006
Crews have been placing the siding on the east side of the King’s Pointe facility. |

12/05/2006
Crews have also started to place the wood columns on the north side of the building.
|

12/05/2006
Crews are placing the cultured stone along the bottom half of the building on the east side. |
|
May Photos
June Photos
July Photos
August Photos
September Photos
October Photos
November Photos
December Photos
January Photos February Photos March Photos May '07 Photos
June '07 Photos
July '07 Photos
August '07 Photos |
More Photos: Waterpark Indoor Waterpark Golf Course Sunrise Pointe Filter Building Great Lawn Aerial Professional Webcams
|