Click photos for a larger view
1/11/2007
A picture of the north side of the King’s Pointe facility showing the finishes on the exterior of the facility, most of the cultured stone has been placed along the bottom of the building.
|
1/11/2007
This picture shows the view out the windows from the entry of King’s Pointe as you enter the lobby area of the facility. |

1/11/2007
This picture is a close up view of the lake from the windows in the lobby. |

1/11/2007
A look down one of the halls in the eastern end of the facility with the insulation placed and the sheet rock ready to be installed. |

1/11/2007
Crews have been installing insulation in the walls of the individual rooms of King’s Pointe Resort. |
1/11/2007
Down another hallway crews have installed the insulation and have placed the sheet rock on the walls and begun the process of taping the walls. |

1/11/2007 A look out the south windows of the lobby from the second floor overlook, you can see the restaurant area taking shape on the left side.
|

1/11/2007
A picture showing the south side of the King’s Pointe facility on the east end and the progress happening on this side of the building.
|

1/11/2007
The metal door frames are now onsite and ready for installation in the individual rooms within the resort facility.
|
|
May Photos
June Photos
July Photos
August Photos
September Photos
October Photos
November Photos
December Photos
January Photos February Photos March Photos May '07 Photos
June '07 Photos
July '07 Photos
August '07 Photos |
|
More Photos: Waterpark Indoor Waterpark Golf Course Sunrise Pointe Filter Building Great Lawn Aerial Professional Webcams
|