Storm Lake Iowa Project Awaysis


Click photos for a larger view

7/02/2006
A member of the construction crew rolls on a water/vapor barrier on the poured outside walls of the lodge on the east side.  The area above where he has placed the barrier will eventually be covered with cultured stone.

7/02/2006
This picture is a shot of the west side of the lodge basement looking west.  The picture shows the underground piping that the mechanical contractor has placed in the ground prior to the pouring of the floor for this area.  Since the west side of the basement holds all the “back of house” type functions, including the mechanical and cleaning facilities there are several pipes that feed different functions of the lodge in this area.

7/02/2006
This picture shows the east side of the lodge and the walls that have been completed to date.

7/21/2006
Crews have progressed on the east side of the lodge with the back walls and are smoothing out the sub-base in preparation of pouring the floors on this side of the lodge.

7/21/2006
Over at the lodge the east end walk out room now have some of the brick footing poured showing a pit of what the outside wall will look like when it gets taken upward.  You can also see the support poles that the contractor has put in place as they prepare to pour the floor of the area.

May Photos

June Photos

July Photos

August Photos

September Photos

October Photos

November Photos

December Photos

January Photos

February Photos

March Photos

May '07 Photos

June '07 Photos

July '07 Photos

August '07 Photos

 

   

More Photos:    Waterpark   Indoor Waterpark   Golf Course   Sunrise Pointe   Filter Building   Great Lawn    Aerial   Professional   Webcams