Storm Lake Iowa Project Awaysis


Click photos for a larger view



06/02/2006
This picture is looking east at the basement level of the lodge. You can see that crews have begun digging and putting the rebar in the footings at the back or north end of the lodge.

6/09/2006
This picture is looking west across the lower (basement) level of the lodge.  The concrete strips running through the dirt are the poured footings.

6/09/2006
This is a closer shot of the basement level showing the back wall of the lodge going up.  The actual part going up in this picture is the frames in which crews will pour concrete into to form the concrete walls for the basement.  The second set of footings just left of the where the wall is going up are the footings for the other side wall of the hallway along the walkout guest rooms on the lower level east of the lodge.

6/16/2006
Crews are working on the forms that will eventually help form the basement walls of the lodge on the north side of the basement.  In the background you can see an excavator digging the foundations of the interior walls on the west side of the basement.

6/16/2006
This picture shows the first walls that have been cast with concrete on the North side of the basement of the lodge and the forms that have been set up for additional pours.

6/16/2006
Crews are digging footings on the west side of the lodge as this picture shows looking east.  The large crane that is just north of the cast wall is used to lift the concrete into the wall forms.

May Photos

June Photos

July Photos

August Photos

September Photos

October Photos

November Photos

December Photos

January Photos

February Photos

March Photos

May '07 Photos

June '07 Photos

July '07 Photos

August '07 Photos

   

More Photos:    Waterpark   Indoor Waterpark   Golf Course   Sunrise Pointe   Filter Building   Great Lawn    Aerial   Professional   Webcams