10/06/2006
Crews are trenching the lines for the underground service lines for electric, gas, and communications. |
10/06/2006
A shot looking south as you come into King’s Pointe the lobby is in front of us. The beams above with the wood railing is the walkway for the second floor that cuts through the middle of two story lobby. |

10/06/2006
A shot looking back at the King’s Pointe Resort facility to the east showing the first level of the building now has the walls framed in and the steel beams for the second story beginning to go up. |

10/06/2006
Picture from the third floor of the east side of the resort looking down on the kitchen where crews have poured the ceiling over the kitchen area. |

10/06/2006
Crews are installing the western elevator shaft that will service the hotel on the west end near the future development of the indoor waterpark. |

10/13/2006
The framing contract has begun the work of installing the windows and patio doors on the east half of the King’s Pointe Resort facility. |

10/13/2006
Crews begin laying out the space for the Regatta Grille. |

10/13/2006
A look back at the lodge from the child play area of the outdoor water park shows that most of the framing on the first floor of the west half of King’s Pointe has been completed. You can also see the opening of where the Regatta Grille will be framed currently in the red steel beams. |

10/13/2006
The framers have begun work on the wood framing of the west half of the facility including the area for the convention facilities, lobby, and kitchen areas. |

10/20/2006
A view of the south side of the King’s Pointe Resort facility. |

10/20/2006
A view of the west side of the basement level of the King’s Pointe facility where the mechanical and staff areas of the facility will eventually be located. The area is be prepared for the pouring of the concrete floor. |

10/20/2006
A view looking north at the entrance to King’s Pointe. |

10/20/2006
This view is from the middle of the lobby of King’s Pointe looking south. Guests will be greeted with this view of the lake as they come into the facility (minus the construction equipment). |

10/20/2006
Crews install track for sound proofing prior to the installation of sheet rock on the inside of the eastern half of the resort. |

10/20/2006
This photo is looking down the second floor hallway. To the left is the opening that looks down to the lobby and out to the lake. |

10/20/2006
View of the Regatta Grille from the third floor of the resort just above the south end of the lobby. Some of the footings for the restaurant have been poured. |

10/20/2006
View of the second floor framing from the third floor. |

10/20/2006
The roofing contractors are onsite working on the east end of the resort facility. |

10/20/2006
The roof of the east section of King’s Pointe Resort is going on. |

10/20/2006
Most of the widows and patio doors are now installed on the north and south sides of the King’s Pointe Resort. Additionally, the second floor on the west half of the building is going up. |
10/27/2006
Crews have begun pouring the concrete floors in the basement level of the west half of the lodge building. This section will house the maintenance components and mechanical systems of the resort. |

10/27/2006
Crews have begun putting up sheet rock in the hallway of the second floor of the resort on the west side. The orange piping shown in this picture is the fire suppression system piping that has been installed. |

10/27/2006
Crews are working on forming and pouring the walls to the Regatta Grille area of the King’s Pointe facility. |
May Photos
June Photos
July Photos
August Photos
September Photos
October Photos
November Photos
December Photos
January Photos February Photos March Photos May '07 Photos
June '07 Photos
July '07 Photos
August '07 Photos |
| |
|
|