(click photos for larger view)

5/10/2006
Crews continue to excavate around what will be the deep end of the outdoor pool. In the back of the photo there is a worker sighting out future walls and digs. The worker is in the deep end of the pool. The deepest portion of the pool is 13 feet deep when finished but crews had to excavate down 18 feet to install the sub-drains, piping, and floors of the pool. |

5/19/2006
The pool contractor has the basic outline of the outdoor aquatic facility (the main pool body) dug and a sub-base of crushed rock put down. The spot where the pool widens out will eventually become the lap lanes for competitive swimming. |

5/26/2006
This picture shows the diving well of the outdoor pool and the main pool drain which has been poured in the middle of the frame. The pipe sticking straight up will eventually be enclosed in the wall of the pool and carry water back to the filter building where it will be re-circulated and returned to the pool. |

5/26/2006
Construction crews are bringing in and leveling out the sub-base for the outdoor pool in this picture, the truck is dumping the crushed rock sub-base in the general area of the zero depth entry. |
May Photos
June Photos
July Photos
August Photos
September Photos
October Photos
November Photos
December Photos
January Photos
February Photos
|
|
More Photos: Waterpark Indoor Waterpark Golf Course Sunrise Pointe Filter Building Great Lawn Aerial Professional Webcams
|